Sheridan Bridge Emergency Beam Removal and Replacement
Hollywood, FL
CEI project administration service for Sheridan Bridge Emergency Beam Removal and Replacement with Broward County Highway Bridge Maintenance Division. Work consisted of two phases: Phase 1: Emergency operation to remove the severed structurally damaged beam barrier walls and bridge deck, shutting down the east bound Sheridan Bridge overpass on Turnpike and setting up detours. Phase 2: Close coordination and design assistance to the bridge designers, strategic coordination with UAOs, FAA, FDOT, Broward County public works division, Cities of Hollywood, Pembroke Pines, Seminole tribe authority, law enforcement agencies, media, office of the Governor to work 3, eight-hour shifts in a span of 15 days to remove the second damaged beam, procure, furnish and install two pretensioned / precast AASHTOO beams, by utilizing a 650 Ton Mobile Crane. Setting up Concrete formwork and reinforcement, for bridge deck and barrier walls, pour ready-mix concrete, remove formwork, install pavement markings, site cleanup, and finally remove the detours and open the east bound to traffic. The Prime Contractor was Cone & Graham and HRD was the EOR.